Pages

Showing posts with label Process Model. Show all posts
Showing posts with label Process Model. Show all posts

Tuesday, December 14, 2010

Want the Process Model which is running in Prod ???


You want to edit the process Model which is live in Prod. (want to add a step) but sadly you are not having the backup of the process model which is in prod. So, how can we survive for the scenario?

In the database(which is the wmPRT is pointing) we have a table - WMPROCESSDEFINITION. This table has a column named 'ProcessFile' and its stores the Process model in blob format. This blob object can be saved (using some SQL Developer or TOAD tools) and renamed to .process. This can be imported in Designer.

In my case I used SQL Developer, right clicked on the cell( row is: ProcessModelId and the column is : ProcessFile ) and saved as file into file system. In the file system i renamed it with the extension .process. And imported this file into the designer. The process which is in Production till now is available in my local also. :)

Saturday, October 9, 2010

Implementing an RN(RosettaNet) interface

  • The document type name and the TPA agreement ID must be same
  • The TPA info must be edited according to the requirement. The default RNIF version in the TPA info is 1.1
  • By changing the property of Data in the TPA to "modifiable", we can change the TPA information even when it is in "AGREED" status
  • The PipDocument is to be mapped into the Documents > payload for the processing of the document